Last Updated on November 12, 2022 by admin
While loading platforms are unquestionably a safer solution for building load-out and vertical logistics, you must remember a few things when using them. These are project lift plans, heights, relocation and installation procedures, and the “proper” training.
Interested to learn more? Then let’s get into it!
Why use crane loading platforms?
Crane loading platform is efficient in loading equipment and materials into building structures during construction operations. With offsite construction increasing loads, these platforms are critical for crane time safety and efficiency on construction sites.
Things you must consider
As with any piece of equipment or operation on a construction site, you need to plan and consider many things to keep the site workers and everyone near the area safe at all times.
Below are some of the key considerations for anyone who is using a loading platform on site. These factors include, but are not limited to:
- Working at a great height
- Planning the entire project’s lift
- Installation and relocation
- Obtaining the ‘proper’ training
Working at a great height
When working at heights, all workers should be aware of approved safety protocols. Moreover, they must be adequately equipped with the company’s best practices for the specific project. The risks and methods that are associated with the project should be taken into consideration.
Moreover, when using the loading platform for unloading, the site operatives typically require access to the platform. Also, they will work at height, so the edge protection of the building must be positioned right on the side of the platform. Furthermore, they must have the appropriate safety harnesses and other applicable Personal Protective Equipment (PPE).
Planning the entire project’s lift
When planning the materials and personnel movement at the site, it is crucial to consider the overall logistics site schedule and develop a plan for all project stages.
When in use, loading platforms stick out from the edge of the building, which can pose a significant risk when used near other lifting equipment, which could include, but is not limited to:
- personnel hoist and lifts
- scissor lifts
- tower and crawler cranes
- temporary crane
Installation and relocation
To achieve optimal productivity and efficiency, contractors will relocate the crane loading platform multiple times after the initial installation. This could mean transferring to a higher level during the construction or merely to various faces of the building, increasing the unloading speed.
When choosing the platform’s location, it is crucial that all personnel and representatives from the subcontractors who will be using the platform or working nearby participate in the decision-making process.
The rental company must be able to provide relocation and installation services by qualified on-site engineers. It can also provide the appropriate training to ensure that every site lifting personnel knows about the installation and relocation.
Obtaining the ‘proper’ training
Every lifting officer must be well briefed on what equipment will be used on site. This will help them identify the possible risks and limitations it may have.
The loading platform rental company must provide on-job-familiarisation training to lifting managers, signalers/slinger, and appointed persons. They must also provide awareness training to other on-site personnel, which includes project and logistics managers.
These are some factors to consider to keep everyone safe when using a loading platform on a construction site. While this piece of equipment is useful, making the operation more productive, it must be operated with care and proper training to avoid any associated risks.
Read more: What to take care of when Operating Cranes in Extreme Weather Conditions?